Land Disturbance Permit – Individual
This permit is commonly issued for projects that require the clearing and disturbing of land for the purposes of building a single family dwelling, a detached garage, or general land clearing. This permit usually can be issued the same day.
Most residential subdivisions in Campbell County require an individual E/S permit for the construction of a single family dwelling.
The general
Building Permit application also has a section for E/S if you prefer to get the building and E/S permits simultaneously.
Individual Permit Process
Fill out a
Land Disturbance permit application. The fee for an individual permit for residential construction is $10.
Individual permits can be issued same day, after which land disturbing activities can begin.
Erosion and Sediment Control Requirements
You will be responsible for the installation and maintenance of all erosion and sediment controls necessary to protect our natural resources and downstream properties. These measures could range from soil stabilization (planting grass), silt fences, and other sediment trapping controls. A complete list of E/S controls and details are located at the Virginia Department of Conservation and Recreation (DCR) website.
Stormwater Management Requirements
Campbell County does not have a stormwater management program, so the Statewide Stormwater Runoff Standard applies. The Erosion and Sediment Control Regulation, Minimum Standard 19 (MS#19) requires properties and waterways downstream from new development be protected from erosion due to increases in volume, velocity, and peak flow rates of stormwater runoff.
Erosion and Sediment Control Regulations (see page 26).
If your project contains permanent stormwater management facilities and or has incorporated any Best Management Practices (BMPs), a Stormwater Management Agreement is required. This is a legal, binding agreement requiring the land owner to maintain these practices to ensure the longevity and operational performances remain within state standards. Please note, if your project requires Stormwater Management or BMPs, this agreement will need to be completed and submitted as part of your permit application.